Split-Type Tube Furnaces for Horizontal or Vertical Operation up to 1300 °C

By adding different gas supply packages, you can work in a protective gas atmosphere, with gases or in a vacuum.

Управление процессами

Функции и оборудование

RSH50_500_13
RSH80_500_13_Begasungspaket.jpg
RSV170_1000_11
RSH80_500_13
RSH120_500_11S__0.jpg
RSH210_1000_11S
RSV80_500_13H2.png

These tube furnaces can be used for horizontal (RSH) or vertical (RSV) operation. The split-type design makes it easy to change the working tube. It allows for a comfortable exchange of various working tubes (e.g. working tubes made of different materials).

Using a wide range of accessories, these professional tube furnaces can be optimally tailored for your process. By adding different gas supply packages, you can work in a protective gas atmosphere, with gases or in a vacuum. In addition to the convenient standard controllers, modern PLC controls can also be used to control the process.

Standard Equipment

  • Tmax 1100 °C or 1300 °C
  • Single-zoned design
  • Dual shell housing made of textured stainless steel sheets with additional fan cooling for low surface temperature
  • Exclusive use of insulation materials without categorization according to EC Regulation No. 1272/2008 (CLP)
  • RSV models with frame for vertical operation
  • Split-type design for simple insertion of the working tube (opening temperature < 180 °C)
  • Ceramic working tube C 530 including two fiber plugs for operation under air
  • Thermocouple type N (1100 °C) or type S (1300 °C)
  • Solid state relays provide for lownoise operation
  • Heating elements on support tubes provide for free radiation
  • RSH: switchgear and control unit integrated in furnace housing
  • RSH: controller with touch operation B510 (5 programs with each 4 segments)
  • RSV: switchgear and control unit separate from furnace in own wall or standing cabinet
  • RSV: controller with touch operation B500 (5 programs with each 4 segments)
  • Defined application within the constraints of the operating instructions
  • NTLog Basic for Nabertherm controller: recording of process data with USB-flash drive

Дополнительное оборудование

Additional Equipment

  • Charge control with temperature measurement in the working tube
  • Three-zone control for optimization of temperature uniformity
  • Cooling systems for accelerated cooling of the working tube and charge
  • Gas supply systems 1,15 or 2 for non-flammable protective or reactive gas operation
  • Gas supply package 4 for hydrogen operation
  • Vacuum package to evacuate the working tube
  • Process control and documentation via VCD software package for monitoring, documentation and control

Спецификации

ModelTmax1Outer dimensions2 in mmMax. outer tube ØHeated lengthLength constant temperature1 +/− 5 KTube lengthConnected loadin kWElectricalWeight
       in mm   in
 in °CW3DHin mmin mmsingle zonedthree zonedin mm1100 °C1300 °Cconnection*kg
RSH 50/250/.. 4203755105025080-6501.91.91-phase25
RSH 50/500/.. 670375510505001702508503.43.41-phase536
RSH 80/500/.. 670445580805001702508506.66.63-phase546
RSH 80/750/..110092049563080750250375110010.612.03-phase576
RSH 120/500/..or6704455801205001702508506.66.63-phase546
RSH 120/750/..1300920495630120750250375110010.612.03-phase576
RSH 120/1000/.. 11704956301201000330500135013.713.73-phase591
RSH 170/750/.. 920495630170750250375110010.612.03-phase576
RSH 170/1000/.. 11704956301701000330500135013.713.73-phase591
              
RSV 50/250/.. 5455909755025080-6501.91.91-phase25
RSV 50/500/.. 5455901225505001702508503.43.43-phase536
RSV 80/500/.. 6155901225805001702508506.66.63-phase546
RSV 80/750/..1100665590147580750250375110010.612.03-phase576
RSV 120/500/..or61559012251205001702508506.66.63-phase546
RSV 120/750/..13006655901475120750250375110010.612.03-phase576
RSV 120/1000/.. 66559017251201000330500135013.713.73-phase591
RSV 170/750/.. 6655901475170750250375110010.612.03-phase576
RSV 170/1000/.. 66559017251701000330500135013.713.73-phase591
1Values outside the tube. Difference to temperature inside the tube up to + 50 K*Please see page 75 for more information about supply voltage
2External dimensions vary when furnace is equipped with additional equipment. Dimensions on request.
3Without tube
4At 415 volt
5At 3-phase execution an N conductor ist required (3/N/PE)

Запрос коммерческого предложения

Запрос коммерческого предложения

CAPTCHA
Этот вопрос задается для того, чтобы выяснить, являетесь ли Вы человеком или представляете из себя автоматическую спам-рассылку.