This compact, semi-automatic system is suitable for hardening in a protective gas atmosphere followed by quenching of the workpiece in oil. In this way, even larger parts can be annealed under a protective gas and quenched. It consists of a chamber furnace N 41/H hardening furnace with a pneumatic door opening and charging plates as well as an oil quench bath on rollers with an integrated pneumatic lowering unit, a floor grid with gas hood, a holding unit for the gas hood as well as a rim exhaust with flame trap. The workpiece is placed on the floor grid and covered with the gas hood. After preflushing with protective gas, the gas hood is pushed with the floor grid into the chamber furnace. After the heat treatment is completed, the workload is pulled out of the furnace onto the lowering unit. The hood remains above the quenching bath while the charging floor grid is lowered pneumatically. In order to obtain best quenching results, the pneumatic lowering unit is moved up and down in the oil quench bath. After completion, the workload is moved into unloading position. This low cost system can be used for hardening processes which otherwise could only be handled in complex furnace systems.

  • Chamber furnace N 41/H
  • Pneumatic pedal switch operated door opening
  • Charging plate
  • Oil quench bath on rollers
  • Pneumatic lowering unit
  • Heating of oil quench bath
  • Oil temperature display
  • Charging floor grid and gas hood
  • Holding unit for gas hood
  • Manual protective gas unit
  • Draw hook
  • Safety equipment consisting of rim exhaust with flame trap and oil steam separator

Dodatkowe wyposażenie

Additional equipment

  • Suction hood
  • Water bath

Specyfikacja techniczna

Furnace Tmax Inner dimensions in mm Volume Outer dimensions in mm Heating Electrical Weight
Model °C w d h in l W D H power in kW1 connection in kg
N 41/H 1280 350 500 250 40 1040 1250 1340 15.0 3-phase 260
1Depending on furnace design connected load might be higher

 

Article no. Protective gas hood size in mm Oil quench bath max. load max. quench Preflush Process Heating power Electrical
  hardening system W D H size in liters Weight yield/h rate flush rate oil bath/kW connection
- SHS 41 260 360 180 400 25 kg 20 kg 20 - 25 10 - 15 6.0 3-phase
631006104 Gas hood (spare part)

Zapytanie ofertowe

Zapytanie ofertowe

CAPTCHA
To pytanie sprawdza czy jesteś człowiekiem i zapobiega wysyłaniu spamu.

Centrum testowe dla klientów

Jaki piec będzie najlepszy do tego specyficznego procesu? Odpowiedź na to pytanie nie zawsze jest prosta. Z tego powodu uruchomiliśmy jedyne w swoim rodzaju, duże i nowoczesne centrum testowe, udostępniające klientom szeroki wybór pieców do testowania.